East Molesey Lock renovation 2013
Molesey Lock is currently being refurbished, this includes a partial refurbishment of the lock chamber including lock fenders, replacing defective sections of lock side concrete walkway and providing a non-slip surface, block paving and refurbishment of the boat rollers.
Photos taken 26 Feb 2013
|